Peran Efisiensi Biaya dan Ketepatan Waktu dalam Hubungan Harga Satuan Pekerjaan dan Kualitas Proyek Konstruksi

Authors

  • Iwan Setiawan Program Studi Magister Teknik Sipil Universitas Narotama Surabaya
  • Zulkifli Lubis Program Studi Magister Teknik Sipil Universitas Narotama Surabaya

DOI:

https://doi.org/10.32585/modulus.v8i1.4732

Abstract

The discrepancy between the Government-established Unit Price (HSP) and the Contractor-prepared HSP is a phenomenon that can potentially impact construction project performance, particularly regarding cost efficiency, schedule adherence, and project quality. This study aims to analyze the influence of Government HSP and Contractor HSP on construction project quality, both directly and through the mediating roles of cost efficiency and schedule adherence. A quantitative approach utilizing Partial Least Squares Structural Equation Modeling (SEM-PLS) was employed. Data were collected via a questionnaire survey involving 300 respondents—comprising Commitment-Making Officials (PPK), supervising consultants, and executing contractors—involved in construction projects in East Kalimantan Province. The SEM-PLS analysis results indicate that Government HSP has a positive and significant effect on cost efficiency (path coefficient = 0.64; t = 9.80; p < 0.001), while Contractor HSP has a positive and significant effect on schedule adherence (path coefficient = 0.62; t = 8.90; p < 0.001). Cost efficiency significantly influences project quality (β = 0.41; t = 6.20; p < 0.001), and schedule adherence also significantly impacts project quality (β = 0.37; t = 5.40; p < 0.001). Mediation analysis confirms that cost efficiency and schedule adherence serve as significant mediators. The structural model demonstrates strong predictive relevance, evidenced by positive Q² values across all endogenous variables. These findings underscore that establishing HSP values that are realistic and aligned with field conditions plays a strategic role in achieving high-quality construction projects.

Keywords: Unit Work Cost; Cost Efficiency; Timeliness; Project Quality; SEM-PLS

Downloads

Published

2026-06-30

Issue

Section

Artikel