Pengaruh Lamanya Waktu Tunggu (Waiting Time) Kapal Terhadap Efisiensi Proses Kegiatan Discharge dan Loading Batu Bara pada PT Adhika Samudera Jaya

Authors

  • Ais Sanda Putra Trisna Politeknik Pelayaran (Poltekpel) Surabaya
  • Faris Nofandi Politeknik Pelayaran (Poltekpel) Surabaya
  • Vigih Hery Kristanto Politeknik Pelayaran (Poltekpel) Surabaya
  • Maulidiah Rahmawati Politeknik Pelayaran (Poltekpel) Surabaya

DOI:

https://doi.org/10.32585/jbfe.v6i1.6615

Keywords:

Discharge, Efficiency, Loading, Port, Shipping, Waiting Time

Abstract

To support the smooth operation of activities at the port and jetty, adequate facilities and operational systems are required. Long waiting times can reduce the efficiency of the loading and unloading process and hinder other operational processes. Delays can increase the operational cycle of ships, raise operational costs, and decrease port productivity. This study aims to examine the impact of ship waiting time on the efficiency of the coal discharge and loading process at PT. Adhika Samudera Jaya. Efficiency in the loading and unloading activities is crucial for increasing productivity and reducing operational costs. The research employs a quantitative method, with data collection through direct observation and documentation. The results indicate that the duration of ship waiting time significantly affects the efficiency of the discharge and loading process, where longer waiting times lead to longer loading and unloading durations. Key factors influencing waiting time include equipment readiness, weather conditions, shipping management, and cargo availability. By improving operational planning and speeding up facility readiness, the efficiency of the coal discharge and loading process can be optimized. This finding is expected to serve as a reference for companies and port authorities in improving the quality of coal loading and unloading services.

Downloads

Download data is not yet available.

References

A. N. Rachmayani, "Metode Kuantitatif, R&D," 2015, p. 6.

E. Lolang, "Hipotesis Nol Dan Hipotesis Alternatif," Hipotesis Nol dan Hipotesis Alternatif, vol. 3, no. 2014, pp. 685-695, 2014. [Online]. Available: https://journals.ukitoraja.ac.id/index.php/jkip/article/view/99.

A. Fahreza, "Efisiensi Proses Bongkar Muatan Batu Bara Untuk Mengatasi Idle Time Oleh PT. Delta Artha Bahari," Jurnal Teknik, vol. 9, no. 1, pp. 45-52, 2024.

H. et al., Metode Penelitian Kualitatif Dan Kuantitatif, Yogyakarta: CV. Pustaka Ilmu, 2020.

Menteri Perhubungan, Republik Indonesia, "KM 14 Tahun 2002 Tentang Penyelenggaraan Dan Pengusahaan Bongkar Muat Barang Dari Dan Ke Kapal," 2002.

S. Negara et al., "Analisis Pengaruh Faktor Penjadwalan Kapal, Jasa Pemanduan, Produktivitas Bongkar Muat Terhadap Waiting Time Kapal," Ocean, vol. 2, no. 1, pp. 76-87, Mar. 2023. [Online]. Available: https://doi.org/10.58192/ocean.v2i2.959.

N. C. Dika, M. Dahri, T. Pribadi, and R. A. Amrullah, "Analisis Perana Dalam Rangka Peningkatan Produktivitas Bongkar (Ship to Ship) Batubara," Jurnal Ilmiah Sain dan Teknologi, vol. 2, pp. 389-398, 2024.

D. Nurhalilah, I. Masdrian, M. S. Munsyawy, and P. Yudyana, "Efisiensi Penyederhanaan Kerja Terhadap Pelayanan Publik Di Masa Pandemi Covid-19," Proceedings UIN Sunan Gunung Djati Bandung, vol. 1, no. 26, pp. 73-77, 2021. [Online]. Available: https://proceedings.uinsgd.ac.id/index.php/proceedings/article/view/417.

P. Muliyah, D. Aminatun, S. S. Nasution, T. Hastomo, S. S. W. Sitepu, and T. Tryana, "Pengaruh," Journal GEEJ, vol. 7, no. 2, pp. 7-71, 2020.

E. Pujiningrum, "Pengaruh Harga, Promosi, Dan Pelayanan Purna Jual Terhadap Kepuasan Pelanggan Di PT Wiratech Surabaya," Ilmu dan Riset Manajemen, vol. 4, pp. 1-19, 2015.

S. M. Syehan, N. A. Wibowo, and F. Nofandi, "Analisis Penerapan Sistem Informasi Manajemen Pada Kegiatan Logistik Di Indonesia," Dinamika Bahari, vol. 2, no. 1, pp. 6-12, 2021.

Soegiyono, Metode Penelitian Kuantitatif, Kualitatif Dan R&D, 2011.

Soegiyono, Metode Penelitian Kuantitatif, ALDABETA, Bandung, 2013.

Sugiyono, "Metode Teknik Pengolahan Data," 2011.

Sugiyono, "Sugiyono 2018 Hal 285," 2018.

S. Syam, "Pengaruh Efektifitas Dan Efisiensi Kerja Terhadap," Jurnal Ilmu Manajemen, vol. 4, no. 2, pp. 128-152, 2020.

The International Handbook of Coal Petrography, "Journal of Geology Sriwijaya," vol. II, no. 2, pp. 1-9, 2022.

UUD 1945, "Negara Republik Indonesia Tahun 1945," Warga dan Negara, pp. 1-166, 1945. [Online]. Available: https://www.bkn.go.id/wp-content/uploads/2014/06/UUD-1945.pdf.

Y. Widiasti and S. Hadi, "Pengaruh Suku Bunga Deposito, Kurs, Dan Inflasi Terhadap Simpanan Dana Pihak Ketiga Pada Bank Umum Di Indonesia Tahun 2015–2019," Journal of Financial Economics & Investment, vol. 2, no. 2, pp. 102-111, 2022.

L. Wijaya and N. Bernard, "Program Perhitungan Waktu Siklus Pengoperasian," Jurnal Teknik Sipil, pp. 49-55, 2023.

N. A. Wiryawan, M. Dahri, T. Pribadi, and D. J. Arisusanty, "Analisis Kegiatan Bongkar Muat Batubara Dengan Proses Ship to Ship (STS) Padakapal," Jurnal Ilmiah Sain dan Teknologi, vol. 2, no. 11, pp. 503-511, 2024.

Downloads

Published

2025-05-17

How to Cite

Ais Sanda Putra Trisna, Faris Nofandi, Vigih Hery Kristanto, & Maulidiah Rahmawati. (2025). Pengaruh Lamanya Waktu Tunggu (Waiting Time) Kapal Terhadap Efisiensi Proses Kegiatan Discharge dan Loading Batu Bara pada PT Adhika Samudera Jaya. Journal of Business, Finance, and Economics (JBFE), 6(1), 125–131. https://doi.org/10.32585/jbfe.v6i1.6615